Modifier and Type | Field and Description |
---|---|
static Key<Integer,Integer> |
Rsc.ACCRUE_AT
Determines how and when resource standard and overtime costs are to be charged, or accrued, to the cost of a
task.
|
static Key<String,Integer> |
Rsc.ACTIVE_DIRECTORY_GUID
The Active Directory
UUID for a resource. |
static Key<BigDecimal,Integer> |
Asn.ACTUAL_COST
The actual cost incurred on an assignment.
|
static Key<BigDecimal,Integer> |
Rsc.ACTUAL_COST
Costs incurred for work already performed by resources on their tasks, along with any other recorded costs
associated with the task.
|
static Key<BigDecimal,Integer> |
Tsk.ACTUAL_COST
Costs incurred for work already performed by resources on their tasks, together with any other recorded costs
associated with the task.
|
static Key<Duration,Integer> |
Tsk.ACTUAL_DURATION
The span of actual working time for a task, based on the scheduled duration and current remaining work or percent
complete.
|
static Key<Date,Integer> |
Asn.ACTUAL_FINISH
The actual finish date of an assignment.
|
static Key<Date,Integer> |
Tsk.ACTUAL_FINISH
The date when a task was completed.
|
static Key<BigDecimal,Integer> |
Asn.ACTUAL_OVERTIME_COST
The actual overtime cost incurred on an assignment.
|
static Key<BigDecimal,Integer> |
Rsc.ACTUAL_OVERTIME_COST
Costs incurred for overtime work already performed on tasks by assigned resources.
|
static Key<BigDecimal,Integer> |
Tsk.ACTUAL_OVERTIME_COST
Costs incurred for overtime work already performed on tasks by assigned resources.
|
static Key<Duration,Integer> |
Asn.ACTUAL_OVERTIME_WORK
The actual amount of an overtime work incurred on an assignment.
|
static Key<Duration,Integer> |
Rsc.ACTUAL_OVERTIME_WORK
The actual amount of overtime work already performed by resource assigned to tasks.
|
static Key<Duration,Integer> |
Tsk.ACTUAL_OVERTIME_WORK
The actual amount of overtime work already performed by resources assigned to tasks.
|
static Key<Duration,Integer> |
Asn.ACTUAL_OVERTIME_WORK_PROTECTED
The duration through which actual work is protected.
|
static Key<Duration,Integer> |
Rsc.ACTUAL_OVERTIME_WORK_PROTECTED
The amount of work through which actual overtime work is protected.
|
static Key<Duration,Integer> |
Tsk.ACTUAL_OVERTIME_WORK_PROTECTED
The duration through which actual overtime work is protected.
|
static Key<Date,Integer> |
Asn.ACTUAL_START
The actual start date of an assignment.
|
static Key<Date,Integer> |
Tsk.ACTUAL_START
The date and time that a task actually began.
|
static Key<Duration,Integer> |
Asn.ACTUAL_WORK
The actual amount of a work incurred on an assignment.
|
static Key<Duration,Integer> |
Rsc.ACTUAL_WORK
The amount of work that has already been done by resource assigned to tasks.
|
static Key<Duration,Integer> |
Tsk.ACTUAL_WORK
The amount of work that has already been done by resources assigned to tasks.
|
static Key<Duration,Integer> |
Asn.ACTUAL_WORK_PROTECTED
The duration through which actual overtime work is protected.
|
static Key<Duration,Integer> |
Rsc.ACTUAL_WORK_PROTECTED
The amount of work through which actual work is protected.
|
static Key<Duration,Integer> |
Tsk.ACTUAL_WORK_PROTECTED
The duration through which actual work is protected.
|
static Key<NullableBool,Integer> |
Prj.ACTUALS_IN_SYNC
Determines whether all actual works have been synchronized with the project.
|
static Key<Double,Integer> |
Asn.ACWP
The actual cost of a work performed on an assignment to-date.
|
static Key<Double,Integer> |
Rsc.ACWP
The actual cost of a work performed by a resource for the project to-date.
|
static Key<Double,Integer> |
Tsk.ACWP
Costs incurred for work already done on a task, up to the project status date or today's date.
|
static Key<NullableBool,Integer> |
Prj.ADMIN_PROJECT
Determines whether a project is an administrative project.
|
static Key<NullableBool,Integer> |
Prj.ARE_EDITABLE_ACTUAL_COSTS
Determines whether actual costs are editable.
|
static Key<String,Integer> |
Asn.ASSIGNMENT_OWNER
The name of an assignment owner.
|
static Key<String,Integer> |
Rsc.ASSIGNMENT_OWNER
The name of an assignment owner.
|
static Key<String,Integer> |
Asn.ASSIGNMENT_OWNER_GUID
The Guid of an assignment owner.
|
static Key<String,Integer> |
Rsc.ASSIGNMENT_OWNER_GUID
The GUID of an assignment owner.
|
static Key<String,Integer> |
Prj.AUTHOR
The author of a project.
|
static Key<NullableBool,Integer> |
Prj.AUTO_ADD_NEW_RESOURCES_AND_TASKS
Determines whether new resources or tasks automatically added to a resource or task pool.
|
static Key<NullableBool,Integer> |
Prj.AUTOLINK
Determines whether inserted or moved tasks are auto linked.
|
static Key<Date,Integer> |
Rsc.AVAILABLE_FROM
The starting date that a resource is available for work at the units specified for the current time period.
|
static Key<Date,Integer> |
Rsc.AVAILABLE_TO
The end date that a resource is available for work at the units specified for the current time period.
|
static Key<Integer,Integer> |
Prj.BASELINE_FOR_EARNED_VALUE
The specific baseline used to calculate Variance values.
|
static Key<Double,Integer> |
Asn.BCWP
The budgeted cost of a work performed on assignment to-date.
|
static Key<Double,Integer> |
Rsc.BCWP
The budgeted cost of a work performed by a resource for the project to-date.
|
static Key<Double,Integer> |
Tsk.BCWP
The cumulative value of the task's percent complete multiplied by the time phased baseline costs.
|
static Key<Double,Integer> |
Asn.BCWS
The budgeted cost of a work on assignment.
|
static Key<Double,Integer> |
Rsc.BCWS
The budget cost of a work scheduled for a resource.
|
static Key<Double,Integer> |
Tsk.BCWS
The cumulative time phased baseline costs up to the status date or today's date.
|
static Key<Integer,Integer> |
Asn.BOOKING_TYPE
The booking type of an assignment.
|
static Key<Integer,Integer> |
Rsc.BOOKING_TYPE
The booking type of a resource.
|
static Key<BigDecimal,Integer> |
Asn.BUDGET_COST
The budgeted cost of resources on an assignment.
|
static Key<BigDecimal,Integer> |
Rsc.BUDGET_COST
Budget costs for budget cost resources.
|
static Key<BigDecimal,Integer> |
Tsk.BUDGET_COST
Budget costs for budget cost resources.
|
static Key<Duration,Integer> |
Asn.BUDGET_WORK
The budgeted work amount for a work or material resources on an assignment.
|
static Key<Duration,Integer> |
Rsc.BUDGET_WORK
budget work for budget work and material resources.
|
static Key<Duration,Integer> |
Tsk.BUDGET_WORK
Budget work for budget work and material resources.
|
static Key<Calendar,Integer> |
Prj.CALENDAR
The project calendar.
|
static Key<Calendar,Integer> |
Rsc.CALENDAR
The calendar of a resource.
|
static Key<Calendar,Integer> |
Tsk.CALENDAR
The task calendar.
|
static Key<NullableBool,Integer> |
Rsc.CAN_LEVEL
Determines whether resource leveling can be done on a resource.
|
static Key<String,Integer> |
Prj.CATEGORY
The category of a project.
|
static Key<String,Integer> |
Rsc.CODE
The code or other information about a resource.
|
static Key<String,Integer> |
Prj.COMMENTS
Project's comments.
|
static Key<Date,Integer> |
Tsk.COMMITMENT_FINISH
The finish date of a delivery.
|
static Key<Date,Integer> |
Tsk.COMMITMENT_START
The start date of a delivery.
|
static Key<Integer,Integer> |
Tsk.COMMITMENT_TYPE
Determines whether a task has an associated delivery or
a dependency on an associated delivery.
|
static Key<String,Integer> |
Prj.COMPANY
The company where a project was created.
|
static Key<Boolean,Integer> |
Asn.CONFIRMED
Determines whether a resource has accepted all of its assignments.
|
static Key<Date,Integer> |
Tsk.CONSTRAINT_DATE
The specific date associated with the constraint type.
|
static Key<Integer,Integer> |
Tsk.CONSTRAINT_TYPE
Provides choices for the type of constraint that can be applied for scheduling a task.
|
static Key<String,Integer> |
Tsk.CONTACT
The name of an individual responsible for a task.
|
static Key<BigDecimal,Integer> |
Asn.COST
The projected or scheduled cost of an assignment.
|
static Key<BigDecimal,Integer> |
Rsc.COST
The total scheduled or projected cost for a resource, based on costs already incurred for work performed by
resources assigned to the tasks, in addition to the costs planned for the remaining work.
|
static Key<BigDecimal,Integer> |
Tsk.COST
The total scheduled or projected cost for a task based on costs already incurred for work performed by resources
assigned to the tasks, in addition to the costs planned for the remaining work.
|
static Key<String,Integer> |
Rsc.COST_CENTER
Indicates which cost center the costs accrued by the resource should be charged to.
|
static Key<BigDecimal,Integer> |
Rsc.COST_PER_USE
The cost that accrues every time that a resource is used.
|
static Key<Integer,Integer> |
Asn.COST_RATE_TABLE_TYPE
The cost rate table used for this assignment.
|
static Key<Double,Integer> |
Asn.COST_VARIANCE
The difference between the baseline cost and total cost for an assignment.
|
static Key<Double,Integer> |
Rsc.COST_VARIANCE
The difference between the baseline cost and total cost for a resource.
|
static Key<Double,Integer> |
Tsk.COST_VARIANCE
The difference between the baseline cost and total cost for a task, resource, or assignment.
|
static Key<Date,Integer> |
Asn.CREATED
The date that the assignment was created.
|
static Key<Date,Integer> |
Rsc.CREATED
The date and time when a resource was added to the project.
|
static Key<Date,Integer> |
Tsk.CREATED
The date when a task was created.
|
static Key<Date,Integer> |
Prj.CREATION_DATE
The date and time when a project was created.
|
static Key<Integer,Integer> |
Prj.CRITICAL_SLACK_LIMIT
The number of days to the end of a task when Microsoft Project
marks that task as a critical task.
|
static Key<String,Integer> |
Prj.CURRENCY_CODE
The three letter currency character code as defined in ISO 4217.
|
static Key<Integer,Integer> |
Prj.CURRENCY_DIGITS
The number of digits after a decimal symbol.
|
static Key<String,Integer> |
Prj.CURRENCY_SYMBOL
The currency symbol used in a project.
|
static Key<Integer,Integer> |
Prj.CURRENCY_SYMBOL_POSITION
The placement of the currency symbol.
|
static Key<Date,Integer> |
Prj.CURRENT_DATE
The system date.
|
static Key<String,Integer> |
Prj.CUSTOM_DATE_FORMAT
Project view custom date format.
|
static Key<Double,Integer> |
Asn.CV
The earned value cost variance.
|
static Key<Double,Integer> |
Rsc.CV
The earned value cost variance, through the project status date.
|
static Key<Double,Integer> |
Tsk.CV
The difference between the baseline cost and total cost for a task.
|
static Key<Integer,Integer> |
Prj.DATE_FORMAT
Project view date format.
|
static Key<Integer,Integer> |
Prj.DAYS_PER_MONTH
The number of days per month.
|
static Key<Date,Integer> |
Tsk.DEADLINE
A target date that indicates when a task is to be completed.
|
static Key<Date,Integer> |
Prj.DEFAULT_FINISH_TIME
The default finish time of new tasks.
|
static Key<Integer,Integer> |
Prj.DEFAULT_FIXED_COST_ACCRUAL
The default type when fixed costs are accrued.
|
static Key<Double,Integer> |
Prj.DEFAULT_OVERTIME_RATE
The default overtime rate for new resources.
|
static Key<Double,Integer> |
Prj.DEFAULT_STANDARD_RATE
The default standard rate for new resources.
|
static Key<Date,Integer> |
Prj.DEFAULT_START_TIME
The default start time of new tasks.
|
static Key<Integer,Integer> |
Prj.DEFAULT_TASK_EV_METHOD
The default earned value method for tasks.
|
static Key<Integer,Integer> |
Prj.DEFAULT_TASK_TYPE
The default type of new tasks.
|
static Key<Duration,Integer> |
Asn.DELAY
The delay of an assignment.
|
static Key<NullableBool,Integer> |
Tsk.DISPLAY_AS_SUMMARY
Determines whether the task should be displayed as a summary task.
|
static Key<Boolean,Integer> |
Tsk.DISPLAY_ON_TIMELINE
Specifies whether a task should be displayed on a timeline view.
|
static Key<Duration,Integer> |
Tsk.DURATION
The total span of active working time for a task as entered or as calculated by Microsoft Project based on start
date, finish date, calendars, and other scheduling factors.
|
static Key<Integer,Integer> |
Prj.DURATION_FORMAT
The format for expressing the bulk duration.
|
static Key<Integer,Integer> |
Tsk.DURATION_FORMAT
Task duration format.
|
static Key<String,Integer> |
Tsk.DURATION_TEXT
Returns the task's duration text.
|
static Key<Duration,Integer> |
Tsk.DURATION_VARIANCE
The difference between the baseline duration of a task and the total duration (current estimate) of a task.
|
static Key<String,Integer> |
Rsc.E_MAIL_ADDRESS
The email address of a resource.
|
static Key<Date,Integer> |
Tsk.EARLY_FINISH
The earliest date that a task could possibly finish, based on early finish dates of predecessor and successor
tasks, other constraints, and any leveling delay.
|
static Key<Date,Integer> |
Tsk.EARLY_START
The earliest date that a task could possibly begin, based on the early start dates of predecessor and successor
tasks and other constraints.
|
static Key<Integer,Integer> |
Prj.EARNED_VALUE_METHOD
The default method for calculating earned value.
|
static Key<Integer,Integer> |
Tsk.EARNED_VALUE_METHOD
Determines whether the % Complete or Physical % Complete field should be used to calculate budgeted cost of work
performed (BCWP).
|
static Key<Date,Integer> |
Prj.EXTENDED_CREATION_DATE
Date used for calculation and reporting.
|
static Key<Integer,Integer> |
Tsk.EXTERNAL_ID
If a task is an external task it contains the task's external Id.
|
static Key<String,Integer> |
Tsk.EXTERNAL_TASK_PROJECT
The source location and task identifier of an external task.
|
static Key<Date,Integer> |
Asn.FINISH
The scheduled finish date of an assignment.
|
static Key<Date,Integer> |
Rsc.FINISH
The date when a resource is scheduled to complete work on all assigned tasks.
|
static Key<Date,Integer> |
Tsk.FINISH
The scheduled finish date of a task.
|
static Key<Date,Integer> |
Prj.FINISH_DATE
The finish date of a project.
|
static Key<Integer,Integer> |
Tsk.FINISH_SLACK
The duration between the Early Finish and Late Finish dates.
|
static Key<String,Integer> |
Tsk.FINISH_TEXT
Returns the task's finish text.
|
static Key<Duration,Integer> |
Asn.FINISH_VARIANCE
The variance of an assignment finish date from a baseline finish date.
|
static Key<Duration,Integer> |
Tsk.FINISH_VARIANCE
The time that represents the difference between the baseline finish date of a task or assignment and its current
finish date.
|
static Key<NullableBool,Integer> |
Prj.FISCAL_YEAR_START
Determines whether the fiscal year numbering is used.
|
static Key<Double,Integer> |
Tsk.FIXED_COST
Shows any non resource task expense.
|
static Key<Integer,Integer> |
Tsk.FIXED_COST_ACCRUAL
Determines choices for how and when fixed costs are to be charged, or accrued, to the cost of a task.
|
static Key<Boolean,Integer> |
Asn.FIXED_MATERIAL
Determines whether the consumption of an assigned material resource occurs in a single, fixed amount.
|
static Key<Integer,Integer> |
Tsk.FREE_SLACK
The time that a task can be delayed without delaying any successor tasks.
|
static Key<Integer,Integer> |
Prj.FY_START_DATE
The month when fiscal year is starting.
|
static Key<String,Integer> |
Rsc.GROUP
The group to which a resource belongs.
|
static Key<String,Integer> |
Rsc.GUID
Contains the generated unique identification code for the resource.
|
static Key<String,Integer> |
Tsk.GUID
The generated unique identification codes for a task.
|
static Key<Boolean,Integer> |
Asn.HAS_FIXED_RATE_UNITS
Determines whether the Units have Fixed Rate.
|
static Key<NullableBool,Integer> |
Tsk.HIDE_BAR
Determines whether the Gantt bar of a task is hidden when displayed in Microsoft Project.
|
static Key<NullableBool,Integer> |
Prj.HONOR_CONSTRAINTS
Determines whether tasks honor their constraint dates.
|
static Key<String,Integer> |
Asn.HYPERLINK
The title of the hyperlink associated with an assignment.
|
static Key<String,Integer> |
Rsc.HYPERLINK
The title of a hyperlink associated with a resource.
|
static Key<String,Integer> |
Tsk.HYPERLINK
The title or explanatory text for a hyperlink associated with a task.
|
static Key<String,Integer> |
Asn.HYPERLINK_ADDRESS
The title of the hyperlink associated with an assignment.
|
static Key<String,Integer> |
Rsc.HYPERLINK_ADDRESS
The hyperlink associated with a resource.
|
static Key<String,Integer> |
Tsk.HYPERLINK_ADDRESS
The address for a hyperlink associated with a task.
|
static Key<String,Integer> |
Prj.HYPERLINK_BASE
Project's hyperlink base.
|
static Key<String,Integer> |
Asn.HYPERLINK_SUB_ADDRESS
The document bookmark of the hyperlink associated with an assignment.
|
static Key<String,Integer> |
Rsc.HYPERLINK_SUB_ADDRESS
The document bookmark of a hyperlink associated with a resource.
|
static Key<String,Integer> |
Tsk.HYPERLINK_SUB_ADDRESS
The specific location in a document in a hyperlink associated with a task.
|
static Key<Integer,Integer> |
Rsc.ID
The position identifier of a resource within the list of resources.
|
static Key<Integer,Integer> |
Tsk.ID
The position identifier of a task within the list of tasks.
|
static Key<NullableBool,Integer> |
Tsk.IGNORE_RESOURCE_CALENDAR
Determines whether the scheduling of the task considers the calendars of the resources assigned to the task.
|
static Key<Boolean,Integer> |
Tsk.IGNORE_WARNINGS
Indicates whether to hide the schedule conflict warning indicator in Microsoft Project.
|
static Key<NullableBool,Integer> |
Rsc.INACTIVE
Determines whether a resource was made inactive by a user who has administrative rights.
|
static Key<String,Integer> |
Rsc.INITIALS
The initials of a resource.
|
static Key<NullableBool,Integer> |
Prj.INSERTED_PROJECTS_LIKE_SUMMARY
Determines whether subtasks are calculated as summary tasks.
|
static Key<NullableBool,Integer> |
Tsk.IS_ACTIVE
Determines whether a task is active.
|
static Key<NullableBool,Integer> |
Rsc.IS_BUDGET
Determines whether a work, material, or cost resource is a budget resource.
|
static Key<NullableBool,Integer> |
Rsc.IS_COST_RESOURCE
Determines whether a resource is a cost resource.
|
static Key<NullableBool,Integer> |
Tsk.IS_CRITICAL
Determines whether a task is on the critical path.
|
static Key<NullableBool,Integer> |
Tsk.IS_EFFORT_DRIVEN
Determines whether the scheduling for the task is effort-driven scheduling.
|
static Key<NullableBool,Integer> |
Rsc.IS_ENTERPRISE
Shows whether a resource is from the enterprise resource pool (true) or the local resource pool (false).
|
static Key<NullableBool,Integer> |
Tsk.IS_ESTIMATED
Determines whether a task is estimated.
|
static Key<NullableBool,Integer> |
Tsk.IS_EXPANDED
Determines whether a summary task is expanded or not in GanttChart view.
|
static Key<Boolean,Integer> |
Tsk.IS_EXTERNAL_TASK
Determines whether a task is external.
|
static Key<NullableBool,Integer> |
Rsc.IS_GENERIC
Determines whether a resource is generic or not.
|
static Key<NullableBool,Integer> |
Tsk.IS_MANUAL
Determines whether a task is manually scheduled.
|
static Key<Boolean,Integer> |
Tsk.IS_MARKED
Shows whether a task is marked for further action or identification of some kind.
|
static Key<NullableBool,Integer> |
Tsk.IS_MILESTONE
Determines whether a task is a milestone.
|
static Key<NullableBool,Integer> |
Rsc.IS_NULL
Determines whether a resource is null.
|
static Key<NullableBool,Integer> |
Tsk.IS_NULL
Determines whether a task is a null task.
|
static Key<NullableBool,Integer> |
Tsk.IS_OVERALLOCATED
Indicates whether a resource is assigned to more work on a specific task or all tasks than can be completed
within normal working capacity.
|
static Key<NullableBool,Integer> |
Tsk.IS_PUBLISHED
Determines whether the current task should be published to Project Server with the rest of the project.
|
static Key<NullableBool,Integer> |
Tsk.IS_RECURRING
Determines whether a task is part of a series of recurring tasks.
|
static Key<NullableBool,Integer> |
Tsk.IS_RESUME_VALID
Determines whether a task can be resumed.
|
static Key<NullableBool,Integer> |
Tsk.IS_ROLLUP
Determines whether information about the subtask Gantt bars will be rolled up to the summary task bar.
|
static Key<Boolean,Integer> |
Tsk.IS_SUBPROJECT
Determines whether a task is an inserted project.
|
static Key<NullableBool,Integer> |
Tsk.IS_SUBPROJECT_READ_ONLY
Determines whether a subproject is read-only.
|
static Key<Boolean,Integer> |
Tsk.IS_SUMMARY
Determines whether a task is a summary task.
|
static Key<Boolean,Integer> |
Rsc.IS_TEAM_ASSIGNMENT_POOL
Shows whether the current resource is a team resource.
|
static Key<NullableBool,Integer> |
Prj.KEEP_TASK_ON_NEAREST_WORKING_TIME_WHEN_MADE_AUTO_SCHEDULED
Determines whether manual tasks must be kept on nearest working time when made as auto scheduled.
|
static Key<String,Integer> |
Prj.KEYWORDS
Project's keywords.
|
static Key<String,Integer> |
Prj.LAST_AUTHOR
Project's last author.
|
static Key<Date,Integer> |
Prj.LAST_PRINTED
Project's last print time.
|
static Key<Date,Integer> |
Prj.LAST_SAVED
The date when a project was saved last time.
|
static Key<Date,Integer> |
Tsk.LATE_FINISH
The latest date that a task can finish without delaying the finish of the project.
|
static Key<Date,Integer> |
Tsk.LATE_START
The latest date that a task can start without delaying the finish of the project.
|
static Key<NullableBool,Integer> |
Tsk.LEVEL_ASSIGNMENTS
Determines whether the leveling function can delay and split individual assignments in order to resolve over
allocations.
|
static Key<NullableBool,Integer> |
Tsk.LEVELING_CAN_SPLIT
Determines whether the resource leveling function can cause splits on remaining work on this task.
|
static Key<Duration,Integer> |
Asn.LEVELING_DELAY
The delay caused by leveling.
|
static Key<Duration,Integer> |
Tsk.LEVELING_DELAY
The time that a task is to be delayed from its early start date because of resource leveling.
|
static Key<Integer,Integer> |
Asn.LEVELING_DELAY_FORMAT
The duration format of a delay.
|
static Key<Integer,Integer> |
Tsk.LEVELING_DELAY_FORMAT
The format of expressing the duration of a delay.
|
static Key<Boolean,Integer> |
Asn.LINKED_FIELDS
Determines whether the Project is linked to another OLE object.
|
static Key<String,Integer> |
Prj.MANAGER
The manager of a project.
|
static Key<Duration,Integer> |
Tsk.MANUAL_DURATION
Defines manually scheduled duration of a task.
|
static Key<Date,Integer> |
Tsk.MANUAL_FINISH
Defines manually scheduled finish of a task.
|
static Key<Date,Integer> |
Tsk.MANUAL_START
Defines manually scheduled start of a task.
|
static Key<String,Integer> |
Rsc.MATERIAL_LABEL
The unit of measure for the material resource.
|
static Key<Double,Integer> |
Rsc.MAX_UNITS
The maximum number of units representing the maximum capacity for which a resource is available to accomplish any
tasks during the current time period.
|
static Key<NullableBool,Integer> |
Prj.MICROSOFT_PROJECT_SERVER_URL
Determines whether a project was created by a Project Server user as opposed to an NT user.
|
static Key<Boolean,Integer> |
Asn.MILESTONE
Determines whether the assignment is a milestone.
|
static Key<Integer,Integer> |
Prj.MINUTES_PER_DAY
The number of minutes per day.
|
static Key<Integer,Integer> |
Prj.MINUTES_PER_WEEK
The number of minutes per week.
|
static Key<NullableBool,Integer> |
Prj.MOVE_COMPLETED_ENDS_BACK
Determines whether the end of completed portions of tasks scheduled to start
after the status date but started earlier should be moved back to the status date.
|
static Key<NullableBool,Integer> |
Prj.MOVE_COMPLETED_ENDS_FORWARD
Determines whether the end of completed portions of tasks scheduled
to have been completed before the status date but begun later
should be moved up to the status date.
|
static Key<NullableBool,Integer> |
Prj.MOVE_REMAINING_STARTS_BACK
Determines whether the beginning of remaining portions of tasks scheduled to start
after the status date but started earlier should be moved back to the status date.
|
static Key<NullableBool,Integer> |
Prj.MOVE_REMAINING_STARTS_FORWARD
Determines whether the beginning of remaining portions of tasks
scheduled to have begun later should be moved up to the status date.
|
static Key<NullableBool,Integer> |
Prj.MULTIPLE_CRITICAL_PATHS
Determines whether multiple critical paths are calculated.
|
static Key<String,Integer> |
Prj.NAME
The name of the project.
|
static Key<String,Integer> |
Rsc.NAME
The name of a resource.
|
static Key<String,Integer> |
Tsk.NAME
A task's name.
|
static Key<Integer,Integer> |
Prj.NEW_TASK_START_DATE
The default start date type for new tasks.
|
static Key<NullableBool,Integer> |
Prj.NEW_TASKS_ARE_MANUAL
Determines whether new tasks created as manual.
|
static Key<NullableBool,Integer> |
Prj.NEW_TASKS_EFFORT_DRIVEN
Determines whether new tasks are effort driven.
|
static Key<NullableBool,Integer> |
Prj.NEW_TASKS_ESTIMATED
Determines whether an estimated duration is shown by default.
|
static Key<String,Integer> |
Asn.NOTES
The text notes associated with an assignment.
|
static Key<String,Integer> |
Rsc.NOTES
The text notes associated with a resource.
|
static Key<String,Integer> |
Rsc.NOTES_RTF
The text notes in RTF format.
|
static Key<String,Integer> |
Tsk.NOTES_RTF
The text notes in RTF format.
|
static Key<String,Integer> |
Rsc.NOTES_TEXT
Notes' plain text extracted from RTF data.
|
static Key<String,Integer> |
Tsk.NOTES_TEXT
Notes' plain text extracted from RTF data.
|
static Key<Integer,Integer> |
Tsk.OUTLINE_LEVEL
The outline level of a task.
|
static Key<String,Integer> |
Tsk.OUTLINE_NUMBER
The number that represents a task's position in the hierarchical outline structure.
|
static Key<Boolean,Integer> |
Asn.OVERALLOCATED
Determines whether the assignment is overallocated.
|
static Key<NullableBool,Integer> |
Rsc.OVERALLOCATED
Indicates whether a resource is assigned to more work on a specific task or all tasks than can be completed
within normal working capacity.
|
static Key<BigDecimal,Integer> |
Asn.OVERTIME_COST
The sum of the actual and remaining overtime cost of an assignment.
|
static Key<BigDecimal,Integer> |
Rsc.OVERTIME_COST
The total overtime cost for a resource on all assigned tasks.
|
static Key<BigDecimal,Integer> |
Tsk.OVERTIME_COST
The total overtime cost for a task, for a resource on all assigned tasks, or for a resource assignment.
|
static Key<BigDecimal,Integer> |
Rsc.OVERTIME_RATE
The rate of pay for overtime work performed by a resource.
|
static Key<Integer,Integer> |
Rsc.OVERTIME_RATE_FORMAT
The units used by Microsoft Project to display the overtime rate.
|
static Key<Duration,Integer> |
Asn.OVERTIME_WORK
The scheduled overtime work of an assignment.
|
static Key<Duration,Integer> |
Rsc.OVERTIME_WORK
The amount of overtime scheduled to be performed by a resource on a task and charged at the overtime rates of the
resources involved.
|
static Key<Duration,Integer> |
Tsk.OVERTIME_WORK
The amount of overtime scheduled to be performed by all resources assigned to a task.
|
static Key<Double,Integer> |
Asn.PEAK_UNITS
The maximum number of units that a resource is assigned for a task.
|
static Key<Double,Integer> |
Rsc.PEAK_UNITS
The maximum assignment unit for a resource at any one point in time for all tasks to which the resource is
assigned.
|
static Key<Integer,Integer> |
Tsk.PERCENT_COMPLETE
The current status of a task, expressed as the percentage of the task's duration that has been completed.
|
static Key<Integer,Integer> |
Asn.PERCENT_WORK_COMPLETE
The amount of a work completed on an assignment.
|
static Key<Integer,Integer> |
Rsc.PERCENT_WORK_COMPLETE
The percentage of work completed across all tasks.
|
static Key<Integer,Integer> |
Tsk.PERCENT_WORK_COMPLETE
The current status of a task expressed as the percentage of work that has been completed.
|
static Key<String,Integer> |
Rsc.PHONETICS
The phonetic spelling of the resource name.
|
static Key<Integer,Integer> |
Tsk.PHYSICAL_PERCENT_COMPLETE
Percent complete value that can be be used as an alternative for calculating budgeted cost of work performed
(BCWP).
|
static Key<Date,Integer> |
Tsk.PRELEVELED_FINISH
The finish date of a task as it was before resource leveling was done.
|
static Key<Date,Integer> |
Tsk.PRELEVELED_START
The start date of a task as it was before resource leveling was done.
|
static Key<Integer,Integer> |
Tsk.PRIORITY
The level of importance given to a task, which in turn indicates how readily a task or assignment can be delayed
or split during resource leveling.
|
static Key<NullableBool,Integer> |
Prj.PROJECT_EXTERNALLY_EDITED
Determines whether the project was externally edited.
|
static Key<Integer,Integer> |
Asn.RATE_SCALE
The time unit for the usage rate of the material resource assignment.
|
static Key<Duration,Integer> |
Asn.REGULAR_WORK
The amount of a non-overtime work scheduled for an assignment.
|
static Key<Duration,Integer> |
Rsc.REGULAR_WORK
The total amount of non overtime work scheduled to be performed by resource.
|
static Key<Duration,Integer> |
Tsk.REGULAR_WORK
The total amount of non overtime work scheduled to be performed by resources.
|
static Key<BigDecimal,Integer> |
Asn.REMAINING_COST
The remaining projected cost of completing an assignment.
|
static Key<BigDecimal,Integer> |
Rsc.REMAINING_COST
The remaining scheduled expense that will be incurred in completing the remaining scheduled work.
|
static Key<BigDecimal,Integer> |
Tsk.REMAINING_COST
The remaining scheduled expense that will be incurred in completing the remaining scheduled work.
|
static Key<Duration,Integer> |
Tsk.REMAINING_DURATION
The time that is required to complete the unfinished part of a task.
|
static Key<BigDecimal,Integer> |
Asn.REMAINING_OVERTIME_COST
The remaining projected overtime cost of completing an assignment.
|
static Key<BigDecimal,Integer> |
Rsc.REMAINING_OVERTIME_COST
The remaining scheduled overtime expense for a resource.
|
static Key<BigDecimal,Integer> |
Tsk.REMAINING_OVERTIME_COST
The remaining scheduled overtime expense for a task.
|
static Key<Duration,Integer> |
Asn.REMAINING_OVERTIME_WORK
The remaining overtime work scheduled to complete an assignment.
|
static Key<Duration,Integer> |
Rsc.REMAINING_OVERTIME_WORK
The amount of remaining scheduled overtime.
|
static Key<Duration,Integer> |
Tsk.REMAINING_OVERTIME_WORK
The amount of remaining scheduled overtime time.
|
static Key<Duration,Integer> |
Asn.REMAINING_WORK
The remaining work scheduled to complete an assignment.
|
static Key<Duration,Integer> |
Rsc.REMAINING_WORK
The time still required to complete a task or setInternal of tasks.
|
static Key<Duration,Integer> |
Tsk.REMAINING_WORK
The time still required to complete a task or setInternal of tasks.
|
static Key<NullableBool,Integer> |
Prj.REMOVE_FILE_PROPERTIES
Determines whether all file properties will be removed on save.
|
static Key<Resource,Integer> |
Asn.RESOURCE
The resource assigned to a task.
|
static Key<Boolean,Integer> |
Asn.RESPONSE_PENDING
Determines whether the response has been received for a TeamAssign message.
|
static Key<Date,Integer> |
Asn.RESUME
The date when assignment is resumed.
|
static Key<Date,Integer> |
Tsk.RESUME
The date that the remaining part of a task is scheduled to resume after entering any progress.
|
static Key<Integer,Integer> |
Prj.REVISION
The number of times a project was saved.
|
static Key<Integer,Integer> |
Prj.SAVE_VERSION
The version of Microsoft Office Project from which a project file was saved.
|
static Key<NullableBool,Integer> |
Prj.SCHEDULE_FROM_START
Determines whether to calculate the project schedule forward from the start date.
|
static Key<Boolean,Integer> |
Prj.SHOW_PROJECT_SUMMARY_TASK
Determines whether to display summary information about an entire project on a single row with its own summary
task bar at the top of the Gantt Chart view.
|
static Key<NullableBool,Integer> |
Prj.SPLITS_IN_PROGRESS_TASKS
Determines whether in-progress tasks can be split.
|
static Key<NullableBool,Integer> |
Prj.SPREAD_ACTUAL_COST
Determines whether actual costs are spread to the status date.
|
static Key<NullableBool,Integer> |
Prj.SPREAD_PERCENT_COMPLETE
Determines whether a percent complete is spread to the status date.
|
static Key<BigDecimal,Integer> |
Rsc.STANDARD_RATE
The rate of pay for regular, non-overtime work performed by a resource.
|
static Key<Integer,Integer> |
Rsc.STANDARD_RATE_FORMAT
The units used by Microsoft Project to display the standard rate.
|
static Key<Date,Integer> |
Asn.START
The scheduled start date of an assignment.
|
static Key<Date,Integer> |
Rsc.START
The date when an assigned resource is scheduled to begin working on a task.
|
static Key<Date,Integer> |
Tsk.START
The scheduled start date of a task.
|
static Key<Date,Integer> |
Prj.START_DATE
The start date of a project.
|
static Key<Integer,Integer> |
Tsk.START_SLACK
The duration between the Early Start and Late Start dates.
|
static Key<String,Integer> |
Tsk.START_TEXT
Returns the task's start text.
|
static Key<Duration,Integer> |
Asn.START_VARIANCE
The variance of an assignment start date from a baseline start date.
|
static Key<Duration,Integer> |
Tsk.START_VARIANCE
The time that represents the difference between a baseline start date of a task or assignment and its currently
scheduled start date.
|
static Key<Date,Integer> |
Prj.STATUS_DATE
the status date to display progress or to calculate earned value totals.
|
static Key<String,Integer> |
Tsk.STATUS_MANAGER
The name of the enterprise resource who is to receive status updates for the current task from resources.
|
static Key<Date,Integer> |
Asn.STOP
The date when assignment is stopped.
|
static Key<Date,Integer> |
Tsk.STOP
The date that represents the end of the actual portion of a task.
|
static Key<String,Integer> |
Prj.SUBJECT
The subject of a project.
|
static Key<String,Integer> |
Tsk.SUBPROJECT_NAME
The source location of a subproject.
|
static Key<Boolean,Integer> |
Asn.SUMMARY
Determines whether the task is a summary task.
|
static Key<Double,Integer> |
Asn.SV
The earned value schedule variance, through the project status date.
|
static Key<Double,Integer> |
Rsc.SV
The earned value schedule variance, through the project status date.
|
static Key<Task,Integer> |
Asn.TASK
The task to which a resource is assigned.
|
static Key<NullableBool,Integer> |
Prj.TASK_UPDATES_RESOURCE
Determines whether updates to tasks update resources.
|
static Key<String,Integer> |
Prj.TEMPLATE
Project's template.
|
static Key<Date,Integer> |
Prj.TIMESCALE_FINISH
The date that the timescale in the view finishes.
|
static Key<Date,Integer> |
Prj.TIMESCALE_START
The date that the timescale in the view starts.
|
static Key<String,Integer> |
Prj.TITLE
The title of a project.
|
static Key<Integer,Integer> |
Tsk.TOTAL_SLACK
The time a task's finish date can be delayed without delaying the project's finish date.
|
static Key<Integer,Integer> |
Rsc.TYPE
The type of a resource.
|
static Key<Integer,Integer> |
Tsk.TYPE
The type of a task.
|
static Key<Integer,Integer> |
Asn.UID
The unique identifier of an assignment.
|
static Key<String,Integer> |
Prj.UID
The unique Id of a project.
|
static Key<Integer,Integer> |
Rsc.UID
The unique identifier of a resource.
|
static Key<Integer,Integer> |
Tsk.UID
The unique Id of a task.
|
static Key<Double,Integer> |
Asn.UNITS
The number of units for an assignment.
|
static Key<NullableBool,Integer> |
Prj.UPDATE_MANUALLY_SCHEDULED_TASKS_WHEN_EDITING_LINKS
Determines whether manual tasks must be updated when links were edited.
|
static Key<Boolean,Integer> |
Asn.UPDATE_NEEDED
Determines whether the resource assigned to a task needs to be updated as to the status of the task.
|
static Key<Double,Integer> |
Asn.VAC
The difference between basline cost and total cost.
|
static Key<Boolean,Integer> |
Tsk.WARNING
Represents the flag which indicates that task has schedule discrepancies.
|
static Key<String,Integer> |
Tsk.WBS
Work breakdown structure (WBS) codes.
|
static Key<String,Integer> |
Tsk.WBS_LEVEL
The rightmost WBS level of a task.
|
static Key<Integer,Integer> |
Prj.WEEK_START_DAY
First day of a week.
|
static Key<String,Integer> |
Rsc.WINDOWS_USER_ACCOUNT
The NT account associated with a resource.
|
static Key<Duration,Integer> |
Asn.WORK
The amount of scheduled work for an assignment.
|
static Key<Duration,Integer> |
Rsc.WORK
The total amount of time scheduled for a resource on a task.
|
static Key<Duration,Integer> |
Tsk.WORK
The total time scheduled on a task for all assigned resources.
|
static Key<Integer,Integer> |
Asn.WORK_CONTOUR
The work contour of an assignment.
|
static Key<Integer,Integer> |
Prj.WORK_FORMAT
The format used to show the duration of the task.
|
static Key<Duration,Integer> |
Asn.WORK_VARIANCE
The difference between baseline work of a task and the currently scheduled work.
|
static Key<Double,Integer> |
Rsc.WORK_VARIANCE
The difference between baseline work of a resource and the currently scheduled work.
|
static Key<Duration,Integer> |
Tsk.WORK_VARIANCE
The difference between baseline work of a task and the currently scheduled work.
|
static Key<Integer,Integer> |
Rsc.WORKGROUP
The type of a workgroup to which a resource belongs.
|
Modifier and Type | Method and Description |
---|---|
<T> T |
ResourceAssignment.get(Class<T> typeOfT,
Key<T,Integer> key) |
<T> T |
Project.get(Key<T,Integer> key)
Returns the value to which the property is mapped in this container.
|
<T> T |
Resource.get(Key<T,Integer> key)
Returns the value to which the property is mapped in this container.
|
<T> T |
ResourceAssignment.get(Key<T,Integer> key)
Returns the value to which the property is mapped in this container.
|
<T> T |
Task.get(Key<T,Integer> key)
Returns the value to which the property is mapped in this container.
|
<T> void |
Resource.set(Class<T> typeOfT,
Key<T,Integer> key,
T val) |
void |
Project.set(Key<Date,Integer> key,
Date val)
Maps the specified property to the specified value in this container.
|
void |
Resource.set(Key<Date,Integer> key,
Date val)
Maps the specified property to the specified value in this container.
|
void |
ResourceAssignment.set(Key<Date,Integer> key,
Date val)
Maps the specified property to the specified value in this container.
|
void |
Task.set(Key<Date,Integer> key,
Date val)
Maps the specified property to the specified value in this container.
|
<T> void |
Project.set(Key<T,Integer> key,
T val)
Maps the specified property to the specified value in this container.
|
<T> void |
Resource.set(Key<T,Integer> key,
T val)
Maps the specified property to the specified value in this container.
|
<T> void |
ResourceAssignment.set(Key<T,Integer> key,
T val)
Maps the specified property to the specified value in this container.
|
<T> void |
Task.set(Key<T,Integer> key,
T val)
Maps the specified property to the specified value in this container.
|